What is the Method Statement in construction?
Table of Contents
- 1 What is the Method Statement in construction?
- 2 How do you write a Method Statement for a construction project?
- 3 What is the purpose of a method statement on a construction site?
- 4 What are the construction methods?
- 5 What is a method statement template?
- 6 What is a method statement example?
- 7 What is a work method statement?
- 8 What is a construction method?
What is the Method Statement in construction?
Method statements are documents that detail exactly how to carry out work safely. When it comes to ensuring building site health and safety, method statements are key. The purpose of method statements is to describe the safety precautions to put in place to control risks identified in the risk assessment.
How do you write a Method Statement for a construction project?
Your method statement should include a few important items, such as:
- The project.
- The activity.
- Date of assessment.
- Assessor.
- Responsibilities.
- Hazards (or reference to relevant risk assessment)
- Work procedure and control measures. Sequence of work. Access provisions. Security and safety of others. Techniques.
- PPE requirements.
What should a Method Statement look like?
A method statement should also include: Name of the company. Start and completion dates. Location of where the task will be carried out, including address. Site contact details, including Site Supervisor and who to contact in case of emergency.
What is the legal requirements of a Method Statement on a construction site?
The method statement must be site specific, reviewed and revised for each job, and communicated to all who are required to work to it. Often in the construction industry, for example, one project finishes and a similar operation is repeated on the next job.
What is the purpose of a method statement on a construction site?
The method statement is an effective way of providing information to employees about how they expect the work to be carried out and the precautions that should be taken. The most effective method statements often include diagrams to make it clear how work should be carried out.
What are the construction methods?
Construction methods
- Advanced construction technology.
- Arches.
- Assembly.
- Base construction.
- Basement excavation.
- Barrel vault.
- Blockwork.
- Brick.
Why is a method statement important?
A method statement helps manage the work and ensures that the necessary precautions have been communicated to those involved. The process of preparing a written method statement provides evidence that: Significant health and safety risks have been identified.
How do you fill out a method statement?
What Do I Need to Include in My Method Statement?
- The name of the project and its reference.
- A brief summary of what the work is.
- Where the work is taking place (address).
- Start and expected completion dates for the work.
- The issue date and the unique document number.
- Details about the company carrying out the activity.
What is a method statement template?
A method statement is a type of health and safety document that people usually use for high-risk work. The document should identify the potential hazards that may arise during a particular task and outline the necessary precautions that must be put in place and taken by workers.
What is a method statement example?
For example, a plan could show the location of a hazard or where welfare facilities are. You might get asked for a method statement with a risk assessment, and clients will often ask for a copy of your ‘RAMS’, which means risk assessments and method statements.
How many types of construction methods are there?
The four basic types of structure are residential, institutional and commercial, industrial, and infrastructure/heavy.
What are examples of interior construction materials?
Types Of Interior Wall Materials
- Plywood. Even though it is technically understated, it consists of a bunch of sheets of veneer wood that are glued together.
- Cinder Blocks. Sometimes paneled and poured concrete makes one obvious choice.
- Acoustic Tiles.
- Glass.
- Wood.
- Cork.
- Steel Sheets.
- Peg Board.
What is a work method statement?
A work method statement is prepared for each task on a particular worksite, the group of work method statements are then packaged and is typically submitted at the beginning of a project for approval by the client or their representative.
What is a construction method?
Construction methods. These include preparation of the project site, earth-moving, foundation treatment, steel erection, concrete placement, asphalt paving, and electrical and mechanical installations. Procedures for each of these fields are generally the same, even when applied to different projects, such as buildings, dams, or airports.
What is construction mission statement?
Mission Statement. To be the preeminent provider of superior construction services by consistently improving the quality of our product; to add value for clients through innovation, foresight, integrity, and aggressive performance; and to serve with character and purpose that brings honor to God.
What is a method statment?
A method statement as its name implies is a step wise statement or method described to perform a certain activity or operation. Method of statement can be in the form of a flowchart or a written step wise guide.